Skip to content
Index · 28 projects

Projects

Everything is listed once here, ordered by depth of documentation rather than by date. The three areas below are views into the same set, a project can appear in more than one.

Image needed

/images/drone-immobilisation/hero.webp

Rendered concept visual: an interceptor drone approaching a target drone entangled in cord under a parachute

hero.webp
Innovation, Design and consulting

Biologically inspired drone immobilisation

Sole author, designed, built and ran all 109 experiments

Finding the most effective way to stop a drone, through 109 experiments

Master's thesis. Illegal drone incidents in Denmark rose from 62 in 2023 to 206 in 2024, however Danish police still have no local counter-drone tool other than a firearm, and this means that they usually decline to act, since the available response is either too slow or disproportionate to the threat. I ran 109 experiments against a spinning drone propeller in order to find out what physically stops a drone without destroying it, and then validated the best candidates on a free-flying FPV drone. The answer turned out to be a frayed rope, with five out of five instant stops on the rig, confirmed in flight.

2026Open →
Image needed

/images/happylight/hero.webp

Light pillar standing on grass at night, casting a warm pool of light downward and a blue zone glow upward

hero.webp
Mechanical & Hardware Design / Innovation, Design and consulting

HappyLight

Team of 7, stakeholder mapping, interviews, data analysis

Off-grid wayfinding light for festival campsites

A three-module off-grid light pillar built from recycled zinc drainage pipe, which runs 48 hours across a 7-day festival on one charge, sets its own colour by GPS in order to match the festival's zone map, and installs by an untrained volunteer with an earth drill. This lands at 156–269 DKK per unit at 1,000 units.

2025Open →
Image needed

/images/ceto-innovation/hero.webp

Receiving the third-place award at DTU Green Challenge, holding the framed prize plaque

hero.webp
Innovation, Design and consulting

CETO Innovation

Team of 7, industry outreach, market model, customer validation and forecasting

Predictive maintenance for district heating networks

A predictive maintenance SaaS for district heating networks, taken from a course concept into the DTU Skylab incubator, with roughly 3 M DKK in annual saving for a medium-sized utility, a 320.85 M DKK addressable market and third place at DTU Green Challenge.

2025Open →
Image needed

/images/robust-mechanism/hero.webp

Two-player catapult game assembly with the slotted crank mechanism visible

hero.webp
Mechanical & Hardware Design

PultMaster 3000

Team of 6, joint CAD, 3D prints, tolerance stack-up, testing

Tolerance-driven mechanism design

A slotted crank mechanism with a 5/8 gear reduction converting rotation into controlled translation, designed to a tolerance scheme and then built and measured in order to check whether the scheme survived real manufacturing variation.

2025Open →
Image needed

/images/chargemate/obd-setup.webp

Peugeot iOn parked in a carport, the car ChargeMate reads over Bluetooth OBD-II

obd-setup.webp

ChargeMate

Team of 2, wrote all software: OBD-II, threading and charge planning

EV charging planner reading live battery state over CAN bus

2023Open →
Image needed

/images/bike-configurator/hero.webp

Tacton configurator screen for selecting a mountain bike's gears and brakes, with live price and weight totals

hero.webp

Mountain bike configurator

Team of 6, process flows, class diagram, PVM engineering view

From manual quotation to a Tacton configure-to-order system

2024Open →
Image needed

/images/gea-radical-innovation/hero.webp

Presenting the innovation framework findings in a meeting room

hero.webp

Implementing a Radical Innovation Framework at GEA

Team of 2, everything done jointly, from the interviews to the framework

Why radical ideas stall inside a large manufacturer, and what to change

2024Open →
Image needed

/images/camper-van-key/hero.webp

CAD views of the folding Swiss Army knife key concept, with reference planes visible

hero.webp

Camper van key

Team of 5, hand sketching and CAD modelling

Industrial design from clay mock-up to printed model

2021Open →
Image needed

/images/nintendo-64-cad/hero.webp

Rendered CAD reconstruction of a Nintendo 64 console on a plain grey backdrop

hero.webp

Nintendo 64

Team of 2, modelled every component except the top surface shell

CAD reconstruction of a consumer product

2025Open →
Image needed

/images/gogreen/hero.webp

Screens from the final GoGreen prototype laid out in sequence

hero.webp

GoGreen

Team of 6, first prototype UI, usability testing and the pitch

UX design and prototyping against measured targets

2024Open →
Image needed

/images/brewing-experience/hero.webp

Brewing pot installation glowing with coloured light and rising mist

hero.webp

Brew your own beer, a multisensory museum installation

Team of 6, original idea, first prototype and all the programming

Aesthetic experience design for the National Museum of Denmark

2025Open →
Image needed

/images/alfred-office-companion/hero.webp

Studio photo of the assembled Alfred prototype emerging from its enclosure, with a sensor-data laptop behind it

hero.webp

Alfred, an office companion for indoor climate

Team of 3, all CAD drawings and the mechanics

A mechatronic mouse that reacts to noise and air quality

2026Open →
Image needed

/images/herlev-microbiology/lab.webp

Microbiology department storage room with a row of sample fridges and shelving

lab.webp

Cutting interruptions in a hospital microbiology lab

Team of 6, observation study, time measurements and the costed case

Observation study and costed business case at Herlev Hospital

2022Open →
Image needed

/images/skillwalls/hero.webp

Rendered interior view of the SkillWalls honeycomb-panel partition dividing an open-plan flat

hero.webp

SkillWalls - a reusable room divider

Team of 6, jointly responsible for prototyping, pitching and researching

Replacing single-use plasterboard partition walls

2021Open →
Image needed

/images/snickers-circular/hero.webp

Close-up of a construction worker kneeling in Snickers Workwear trousers with a KneeGuard patch

hero.webp

Circular transition path for Snickers Workwear

Team of 5, worked jointly throughout on the transition plan

A prioritised route to circularity for a 5 million garment business

2025Open →

Also in this area

2022R&D process optimisation for COBODRetrofitting new features onto older construction printersTeam of 5, facilitated the process and ran stakeholder interviews jointly
2024Innovation tools for a Danish licorice makerConsulting analysis for Bagsværd LakridsSole author of the individual analysis, the group ran the investigation
2025Vision5 - a facilitation playbookHow to plan and run a workshop when nobody taught you howTeam of 5, equal contribution across playbook, workshops and poster
2025Facilitating innovation in multidisciplinary teamsCoaching another team from assumptions to a prototyping roadmapFacilitator, coached another team through assumptions to prototyping roadmap
2021Forsøgskassen - practical science teaching in a boxA venture built on teachers' preparation timeCMO, marketing, market analysis and the teacher validation interviews
2022ESP32 temperature sensing and controlTwo boards, a web interface and two prototypes tested against tasksTeam of 2, built the WiFi app and sensor setup
2025Reverse-engineering a caliper in CreoParametric reconstruction from the disassembled toolTeam of 2, we each modelled the complete caliper independently
2024Digital twin for cancer treatmentMapping a venture idea on potential against difficultySole author, individual opportunity assessment
2023Attracting the next generation of engineers for DanfossA DEI and recruitment study for Danfoss Region CanadaTeam of 8, led the interviews and co-wrote results and literature
2025Line-following robotA two-IR-sensor line follower with a gripper armTeam of 3, lead designer, CAD, joint circuit work, Arduino programming
2022Extending the M4 metro lineProject plan, business case and risk analysis for a new stretchTeam of 6, project planning, stakeholder and risk analysis
2019A remote-controlled mine clearance vehicleTaking a dangerous job away from the person doing itTeam of 2, PCB design for the remote and receiver boards
2019An electronic dice built from logic gatesKarnaugh map to simulation to a soldered boardTeam of 2, focused on the PCB design and layout